Solar Installation Inspections
Why have you been contacted by Master Electricians Australia about a solar inspection?
Your solar system when installed was registered with the Clean Energy Regulator (CER). The CER has randomly selected your system to be independently inspected at no cost to you as part of the “Small-scale Renewable Energy Scheme (SRES) Inspections Program“.
To accept or decline an inspection, please complete the web form at the bottom of this page.
If you accept this request for an inspection, Master Electricians Australia will organise for a CER Inspector to contact you and arrange an inspection time that suits you.
Who is the Clean Energy Council?
The Clearn Energy Council (CER) is the statutory agency that administers the Australian Government’s SRES Inspections Program under the Renewable Energy Target. Master Electricians Australia has been engaged by the CER to undertake this inspection on its behalf.
Inspection Information
The purpose of the inspection is to ensure that the installation meets the requirements for Commonwealth incentives under the SRES, including Australian Standards for performance and quality, and system design and installation standards. Details regarding the outcomes of the inspection will be shared with you and the relevant state/territory regulator.
- The inspection will take approximately 1 hour
- You or someone you entrust will need to be present, as written consent is required for the inspection to proceed
- Please have any supplied installation documentation, including user manuals, in preparation for your appointment with the inspector
If you have agreed to an inspection but are no longer able to commit to an appointment, please contact Master Electricians Australia as soon as possible on 1300 889 198 or email inspections@masterelectrians.com.au
